Part of 3. Topical Questions – in the Senedd at 3:23 pm on 19 September 2018.
I think a key point to note is the non-EIA approach doesn't mean a full and thorough environmental assessment was not undertaken. A radiological assessment was carried out, it was supported by experts, as well as the wider environmental and human health assessments that are needed for the marine licence determination. An EIA was carried out on the Hinkley Point C project overall. The EIA was submitted as part of the supporting information supplied with the application for the marine licence and as such was considered in the determination—[Interruption.]