Part of 1. Questions to the Minister for Economy and Transport – in the Senedd at 1:59 pm on 12 June 2019.
Well, I can assure the Member that all trains on the network, including those in the metro area, will be replaced, and that there are new trains, many of which will be built in Wales, that will be up to today's modern standards in terms of disabled access. We're also determined, where possible, to increase capacity on railway lines right now, and that's why we've been able to introduce additional rolling stock onto the core Valleys lines in recent months. We're also looking at how we can improve capacity elsewhere across Wales. So, I can assure the Member that we are doing everything we can to identify where rolling stock can be introduced, albeit on a temporary basis, to alleviate congestion whilst those brand-new trains are being constructed.